
Steel Structure Factory Project for Guangdong Zhaoying New Material Technology Co., Ltd.
Completed factory project in Guangdong Province, China, approximately 16,500 m². Bingfa supplied the steel structure and provided on-site installation services.
Planning a steel warehouse, workshop or industrial building? Share your project location, approximate dimensions and intended use. Existing drawings are welcome but not required for an initial inquiry.
Request a Steel Frame Quote
Completed factory project in Guangdong Province, China, approximately 16,500 m². Bingfa supplied the steel structure and provided on-site installation services.

Foshan Dekuo factory project in China — 13,849.56 m². Bingfa supplied the steel structure and provided on-site installation services. Status: Completed.

Completed workshop project in Foshan, China, covering 18,976.89 m². Bingfa supplied the steel structure and provided on-site installation.
BINGFA Steel Structure provides prefabricated steel buildings for industrial, commercial and agricultural projects. Design coordination, manufacturing and installation support are confirmed according to each project’s requirements and agreed scope.
Steel Structure Project Experience
Prefabricated Steel Buildings
Support Across Different Industries
Project Coordination and Support
A steel structure building is a construction made primarily from high-strength steel components such as H-beams and columns. It is widely used for warehouses, workshops, poultry farms, and industrial facilities due to its durability and cost efficiency.
Steel building costs depend on dimensions, structural loads, material specifications, project location and the agreed scope of supply. A preliminary quotation can start with the main steel structure. Roof and wall panels, freight, foundations and installation should be considered separately when required. Customized solutions may vary based on specific requirements.
Manufacturing lead times depend on the building dimensions, structural complexity, material specifications and production schedule. An estimated production timeline can be provided after reviewing the project requirements. Installation duration depends on site conditions, building complexity and the agreed scope of work.
Installation documentation and technical support depend on the agreed scope of each project. If you require installation assistance, please let us know during the inquiry so we can review the available options, responsibilities and local requirements.
Steel buildings can be engineered for project-specific wind, snow and seismic loads, subject to applicable design codes, structural calculations and local site conditions. The required design loads and standards must be confirmed before structural engineering begins.
